Current Projects
2007 ORIS Initiatives (PowerPoint document)
Key Projects Timeline (PDF)
The Granite Project
The Comparative Medicine facility management and protocol submission and review
system will serve the research community by expediting the creation and review
of studies while better utilizing infrastructure and controlling costs. The
.net web, wireless and Oracle architecture will allow research protocols to
be created and reviewed anywhere while increasing the quality of Comparative
Medicine by accurately capturing all facets of the study.
The eIRB Project
eIRB is Northwestern University's Web-based System for submitting and Tracking
IRB Submissions. It allows for electronic submissions and related documents
and accessed anywhere at anytime, and tracks submissions through the IRB approval
process. eIRB has been launched in Evanston. It will replace the current IRB
system NUIRBS and improve process ease and efficiency. Currently, Brenda Bryant
from ORIS are providing IT support on the system.
The ISIS Project
The Office for Research Safety and Office for Research Information Systems
are developing a Web-based system for tracking research safety at Northwestern
University. The new system will replace the paper-based "Safety Plan"
for all researchers. It will replace the numerous forms that researchers formerly
filled out by hand. The University will then be able to more accurately track
potential hazards in the labs.
Paper at the CSHEMA 2008 conference, St. Louis, MO, July 29, 2008 - Office 2003 or Office 2007
PowerPoint Presented at the CSHEMA 2008 conference, St. Louis, MO, July 29, 2008 - Word 2003 or Word 2007
Web Design Project: OR Unit Redesign
In order to best promote, facilitate and enhance research at Northwestern University
as well as to present a united Office for Research identity, the web sites for all OR
units will be redesigned. Implementing the redesign of all the OR Unit websites aims
to create a unified and standard look and feel of the OR website throughout the all
units, improve on the interface of website, and improve its effectiveness. The unit
sites are: ORD, ORI, OSR, OPRS (IRB and ACUC), CCM, ORPFC, ORS and ORAVP. For more
detail see strategic plan document Web Design Project Committees - Phase 2 OR Units.
Stragetic Plan (PDF)
Web Project Organization Chart (PDF)
Web Project Unit Readiness & Priority (Word)
Redesign Process (PDF)
Web Project OR Staff and Customer Requests (Requires VPN for off campus access)
|